Passat installs wall panels of tower coper of the Production Unit 4 Belaruskali
Passat specialists install insulated three-layer reinforced concrete and lightweight building structures made of stainless sandwich panels in thetower copra 4RU of JSC Belaruskali. The installation is completed by 20%.
The replacement of metal structures and ceilings is being completed. After these works are completed, the roof will be repaired. The external water supply networks have been replaced.

Passat mounted part of the LK-1400 belt conveyor at the 2rd Production Unit Belaruskali, JSC. The second oval line has been put into operation. The length of the LC is 1400-320 meters.

The non-destructive testing laboratory of Passat LLC, Soligorsk, has been accredited and received a certificate confirming compliance with the requirements of ISO / IEC 17025-2019 and is accredited in the field of magnetic control of metal structures and special assemblies self-propelled rolling stock.