in the conditions of the current production of the customer
Own geodetic service
Building objects of the first class of complexity
years in the industrial construction market
completed projects
employees
units in our own transport fleet
metalwork and woodworking workshop
core value of the company team
Our events
Passat mounted part of the LK-1400 belt conveyor on 2RU
Passat mounted part of the LK-1400 belt conveyor at the 2rd Production Unit Belaruskali, JSC. The second oval line has been put into operation. The length of the LC is 1400-320 meters.
DetailsPassat installs wall panels of tower coper of the Production Unit 4 Belaruskali
Passat specialists install insulated three-layer reinforced concrete and lightweight building structures made of stainless sandwich panels in the tower copra 4RU of JSC Belaruskali. The installation is completed by 20%.
DetailsNon-destructive testing laboratories of Passat LLC received a certificate of conformity ISO / IEC 17025-2019
The non-destructive testing laboratory of Passat LLC, Soligorsk, has been accredited and received a certificate confirming compliance with the requirements of ISO / IEC 17025-2019 and is accredited in the field of magnetic control of metal structures and special assemblies self-propelled rolling stock.
DetailsA Trial Operation of the Equipment at Petrikov GOK was carried out
30 December 2019 a trial run of technological equipment was carried out at the Petrikov mining and processing plant. So, in parallel with the process of construction of GOK facilities, the customer checks the delivered equipment.
DetailsThe reconstruction completing of the existing competing tower pile drivers of the shafts №3 and №4
Passat LLC is completing one of the most difficult projects for the company - the reconstruction of the existing tower pile drivers of the shafts №3 and №4 of the Production Unit 4 Belaruskali, JSC.
DetailsThe facility of the Plant for the ammonium nitrate production handed
Passat, LLC constructed its facility of the Plant for the ammonium nitrate production. The customer took the entire plant into operation and has already received the first batch of the product.
Details